Home > Terms > Serbian (SR) > метода критичног пута (МКП)
метода критичног пута (МКП)
A schedule network analysis technique used to determine the amount of scheduling flexibility (the least amount of float) on various logical network paths in the project schedule network, and to determine the minimum total project duration. Early start and finish date are calculated by means of a forward pass using a specified start date. Late start and finish dates are calculated by means of a backward pass, starting from a specified completion date, which sometimes is the project early finish date determined during the forward pass calculation.
0
0
Cải thiện
- Loại từ: noun
- Từ đồng nghĩa:
- Blossary:
- Ngành nghề/Lĩnh vực: Business services
- Category: Project management
- Company: WSDOT
- Sản phẩm:
- Viết tắt-Từ viết tắt:
Ngôn ngữ khác:
Bạn muốn nói gì?
Terms in the News
Featured Terms
свећа
A light source typified by a wick embedded in solid fuel, usually fax or fat, and used in Christianity to symbolize the Light of Jesus Christ.
Người đóng góp
Featured blossaries
stanley soerianto
0
Terms
107
Bảng chú giải
6
Followers
God of War
Chuyên mục: Entertainment 1 4 Terms
Browers Terms By Category
- Legal documentation(5)
- Technical publications(1)
- Marketing documentation(1)
Documentation(7) Terms
- Wedding gowns(129)
- Wedding cake(34)
- Grooms(34)
- Wedding florals(25)
- Royal wedding(21)
- Honeymoons(5)
Weddings(254) Terms
- Zoological terms(611)
- Animal verbs(25)
Zoology(636) Terms
- Hand tools(59)
- Garden tools(45)
- General tools(10)
- Construction tools(2)
- Paint brush(1)
Tools(117) Terms
- Social media(480)
- Internet(195)
- Search engines(29)
- Online games(22)
- Ecommerce(21)
- SEO(8)