метода критичног пута (МКП)

A schedule network analysis technique used to determine the amount of scheduling flexibility (the least amount of float) on various logical network paths in the project schedule network, and to determine the minimum total project duration. Early start and finish date are calculated by means of a forward pass using a specified start date. Late start and finish dates are calculated by means of a backward pass, starting from a specified completion date, which sometimes is the project early finish date determined during the forward pass calculation.

0
Thêm vào Bảng chú giải thuật ngữ của tôi

Bạn muốn nói gì?

Bạn phải đăng nhập để gửi thảo luận.

Terms in the News

Featured Terms

Dragan Zivanovic
  • 0

    Terms

  • 0

    Bảng chú giải

  • 10

    Followers

Ngành nghề/Lĩnh vực: Festivals Category: Christmas

свећа

A light source typified by a wick embedded in solid fuel, usually fax or fat, and used in Christianity to symbolize the Light of Jesus Christ.