- Industry: Oil & gas
- Number of terms: 9502
- Number of blossaries: 0
- Company Profile:
George King is a technology provider in the oil and gas industry specializing in new technology and problem oil well solutions.
The time after mixing of the cement slurry before the cement becomes so viscous that it cannot be pumped.
Industry:Oil & gas
The time it takes for drill cuttings to be carried to surface from the bottom of the well.
Industry:Oil & gas
The time spend sliding the drill pipe along the wellbore when leaving or re-entering a well.
Industry:Oil & gas
The time spent waiting on cement to reach sufficient strength to proceed with operations.
Industry:Oil & gas
The time that a cement slurry will remain pumpable at temperature and pressure.
Industry:Oil & gas
The time, based on the separator volume and shape and the fluid flow rate that produced fluids spend in a separator. It is based on the time needed to separate an emulsion.
Industry:Oil & gas
The tool that keeps the pipe string from rotating while a joint is made up.
Industry:Oil & gas
The tool that keeps the pipe string from rotating while a joint is made up.
Industry:Oil & gas
The top of a liner, specifically the interval between the liner top and the shoe of the previous casing.
Industry:Oil & gas